PE PP Film Flakes Plastic Side Screw Granulating Machine
2023-07-24 11:09:52
- Model NO.: SJ
- Screw: Single/Double
- Electromagnetic Heater: Electromagnetic Heater
- Computerized: Computerized
- Certification: CE, ISO9001:2008
- Weight: 3-10t
- Power: 37-132 Kw
- Function: Recycle Waste Bottle and Film
- Voltage: 380V 50Hz
- Warranty: 12 Months
- Trademark: Camel
- Specification: 23000mm*3000mm*3000mm
- HS Code: 84772090
- Raw Material: PP/PE
- Inverter: Inverter
- Automation: Automatic
- Customized: Customized
- Condition: New
- After-Sales Service Provided: Engineers Available to Service Machinery Overseas
- Name: Film Flakes Plastic Side Screw Force Feeder Pelle
- Motor: Siemens Brand
- Application: Waste Plastic Recycling
- Color: Customized
- Transport Package: Standard Shipping Packaging
- Origin: Zhangjiagang Jiangsu China
Product Description
Applicable materials: PP, LDPE, LLDPE, HDPE, BOPP, PS etc.
Material shape:Â Woven bags, printed LDPE film (rolls, loose, bundled), agriculture film, foamed plastics and raffia, etc.
Note: we can help you choose the suitable feeding way, pelletizing way, one stage or two stage according to the
waste material you want to produce. Â
Â
Main Parameter:
Â
Single-stage PE PP film pelletizing machine(with force feeder) | ||||||
Model | SJ-65 | SJ-80 | SJ-100 | SJ-120 | SJ-150 | SJ-200 |
Screw Dia. | 65 | 80 | 100 | 120 | 150 | 200 |
L/D | 28-30 | 28-30 | 28-30 | 28-30 | 28-30 | 28-30 |
Capacity | 60-80kg/h | 80-100kg/h | 150kg/h | 300kg/h | 400kg/h | 500kg/h |
Double-stage PE PP film pelletizing machine (with force feeder) | ||||
Model | SJ-100/100 | SJ-120/120 | SJ-150/150 | SJ-200/200 |
Screw Dia. | 100 | 120 | 150 | 200 |
L/D | 28-30 10-15 |
28-30 10-15 |
28-30 10-15 |
28-30 10-15 |
Capacity | 120-180kg/h | 220-300kg/h | 300-400kg/h | 500-600kg/h |
Please note: Force feeder has two type. one is side force feeder. the other one is vertical side force feeder. we
can recommend you the best solution for recycle waste plastic
Our severce
Â
We will test machines in our factory before delivery. Customer check machines running in our factory, after customer
is fully satisfied with the quality, then delivery, when machines arrive in customer's factory, we will send our
engineer to test the machine in customer's factory
We supply machines technical support, material formulation; guarantee machines and spare parts supply
Â
Â
FAQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
 Q: How long is your delivery time?A: Generally it is 5-10 days if the goods are in stock. or it is 45-60 days if the
goods are not in stock, it is according to what kind of machine you need
 Q: Do you provide samples ? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay
the cost of freight.
 Q: What is your terms of payment ?A: 30% T/T in advance ,70% balance before shipment or NegotiableÂ
If you have another question, please feel free to contact us as below
Packaging & Shipping
Contact Us
Â
Air Volume Regulating Valve,Split Air Conditioner Valve,Manual Air Vent Valve,Galvanized Air Volume Regulating Valve
TAIXING HAITAI GLOBAL TRADE CO.,LTD , https://www.haitship.com